KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  8-24-2009
Number of Hours:  4.75
Manual Reference:  6-x
Brief Description:  Aft nav and strobe light wiring continued...

Picking up where I left off yesterday I drilled the next two bulkheads forward of the aft most bulkhead, deburred the holes, installed grommets and routed the aft nav and strobe light wires through all the bulkheads. Then I reinstalled the horizontal to vertical stabilizer fairing, sanded the reglassing and filling I had done last week and drilled the retaining screw holes to final size. Next I removed the fairing and both stabilizers and drilled, deburred and riveted the fairing retaining screw nut plates to the stabilizers.
' style=

Aft bulheads drilled, grommets installed, nav and strobe light wiring routed

Aft bulheads drilled, grommets installed, nav and strobe light wiring routed

' style=

Horizontal to vertical stabilizer fairing holes drilled to final size

Horizontal to vertical stabilizer fairing holes drilled to final size

' style=

Horizontal to vertical stabilizer fairing retaining screw nut plates installed

Horizontal to vertical stabilizer fairing retaining screw nut plates installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.